A CDU filter housing contains the coolant and connects the filter to the cooling loop. The filter element captures particles. Pressure containment, particle retention and flow resistance require different evidence, even when a supplier sells the two components as one assembly.
For buyers comparing CDU filter housings vs filter elements, the first step is to identify which component each specification describes. A stainless steel grade describes a material. A micron rating describes a filtration characteristic. Neither establishes the complete assembly's suitability for a particular coolant and operating duty.
Use the CDU and cold-plate filter selection guide to define the filtration duty, then use the distinctions below to review drawings, quotations and acceptance documents.
Housing pressure limits and filter-element differential-pressure limits answer different questions.
A micron value needs a retention-efficiency definition and test conditions.
Coolant compatibility includes every wetted component, including seals and element supports.
Approve an identified housing, element and seal configuration together before ordering.
Keep separate entries for the housing and element in the bill of materials. Record the assembled configuration as well, because fit, sealing and operating performance depend on how the components work together.
Specification | Main responsibility | Evidence to request |
|---|---|---|
Pressure containment and temperature envelope | Housing, closure and pressure-boundary connections | Approved drawing, applicable limits and specified pressure-test record |
Inlet/outlet dimensions and installation envelope | Housing | Connection standard, dimensions, flow direction and service-clearance drawing |
Particle-retention rating and efficiency | Filter element | Element code, rating definition, test method and relevant results |
Maximum differential pressure | Element and its support arrangement | Limit for the stated temperature, flow direction and configuration |
Clean pressure drop at operating flow | Complete flow path | Curve identifying housing, element, coolant and measurement boundary |
Coolant compatibility | All wetted parts | Material list and compatibility evidence for the intended fluid and conditions |
The term "CDU filter" can mean an empty housing, a replacement element or a ready-to-install assembly. Ask the supplier to identify the quoted scope before comparing prices.
Housing pressure describes the pressure boundary's permitted operating conditions. Differential pressure is the difference between the filter inlet and outlet pressures under a defined measurement arrangement. A housing pressure rating cannot be used as the element's allowable differential pressure.
Review the housing pressure and temperature limits together. Include the closure, connections, seals and any fitted instruments within the approved configuration. A pressure-test result also needs its procedure and acceptance criteria; a test pressure should not be copied into an operating specification.
For the element, request both the clean operating pressure drop and the maximum permitted differential pressure. Confirm flow direction and any reverse-flow restrictions. The maintenance alarm must account for the element limit and the pressure available to maintain required system flow.
The OCP Liquid-to-Liquid CDU Test Methodology and Performance Rating, Revision 1.0 evaluates TCS pumping head against network pressure losses. Its system-level approach supports checking filter resistance within the full hydraulic duty; it does not supply a universal filter alarm setting.
A housing model name does not establish particle retention. To specify a coolant filter micron rating, identify the element and the evidence behind its rating.
Ask what particle size was evaluated, what fraction was retained, and how the test was performed. If a datasheet uses "nominal" or "absolute," request the supplier's definition. These labels alone do not establish equivalent performance across products. For mesh elements, distinguish an opening-size description from a measured retention-efficiency claim.
Check that the supporting document covers the proposed media, construction and element size. A result for another configuration needs an engineering justification before it can support acceptance. The installed seal arrangement also matters: coolant passing around an incorrectly seated element bypasses its intended filtration path.
Select the rating against the protected equipment's requirements and expected contamination. Avoid assigning one micron value to every CDU application.
A flow-rate number is useful when it states the corresponding pressure drop and test conditions. Request the curve for the proposed assembly, including the selected element. An empty-housing curve describes a different flow path.
The document should identify the coolant, concentration basis, temperature and element condition. It should also show where pressure was measured and whether connections or other components were included. Compare quotations using the same duty point and boundary.
Leave room in the hydraulic assessment for the increase in resistance during service. A clean-filter curve describes initial behavior; it does not predict a maintenance interval without information about contamination loading and operating conditions. Record a clean baseline during commissioning so later measurements can be interpreted at comparable flow and temperature.
Review the complete wetted-material list against the actual coolant formulation. Housing steel is one entry. The review should include the media, support structure, end caps, seals, joining materials and any wetted coatings or adhesives present.
"304 stainless steel" cannot establish compatibility for every part or every coolant. Likewise, "PG25" alone leaves questions about the commercial formulation, concentration basis and additives. Provide the coolant product name and current technical information, together with operating temperature and any cleaning-fluid exposure.
The OCP Modular Technology Cooling System design and delivery guidance calls for evaluating glycol blends and inhibitors against wetted materials and recognizes that fluid temperatures and filtration requirements vary by application. Use that principle to organize a configuration-specific review. Distinguish a material-data assessment from a test completed on the proposed assembly.
Housing design determines how an element is reached and removed. Check the opening clearance, removal direction, drain and vent provisions, and access to the closure. The installation drawing should show the space needed for servicing after adjacent piping and equipment are installed.
For example, LOONGFiltration's CDU-2 inline filter page describes a quick-opening blind cover for element replacement without disconnecting the inlet and outlet piping. Confirm the selected version and arrangement in the quotation and drawing. CDU-2 is a product designation; it does not specify the installed element's micron rating.
Service access should be assessed alongside the approved isolation, depressurization, draining and restart procedure. A convenient opening mechanism does not establish a measured maintenance time. Set cleaning or replacement criteria for the actual element and duty rather than assuming every element can be cleaned and reused.
Give engineering and procurement a common configuration reference. A replacement order should reproduce the approved element and seals, or trigger a documented review of the proposed change.
RFQ or acceptance item | Information to include |
|---|---|
Cooling-loop duty | TCS or facility-side location, protected equipment, flow range and operating conditions |
Mechanical arrangement | Housing code, drawing revision, connection details, orientation and service envelope |
Filtration requirement | Element code, retention target, efficiency definition and acceptable test evidence |
Hydraulic requirement | Clean assembly pressure drop, available pressure budget and element differential-pressure limit |
Fluid and materials | Coolant formulation, concentration basis, temperatures, cleaning fluids and wetted-material list |
Delivery and verification | Agreed pressure/leak checks, cleanliness requirements, inspection documents and replacement-part identification |
Agree on cleanliness and packaging requirements before delivery. Where particle shedding or extractables are an acceptance concern, define the test and limits with the equipment owner. A polished surface or material certificate cannot substitute for that evidence.
No. The installed element determines the filtration rating. Confirm its part code, rating definition and supporting test information. Housing material and pressure containment require their own specifications.
Dimensions are only part of the review. Compare end connections, seal engagement, media, retention performance and differential-pressure limits. Obtain approval for the replacement configuration before fitting it.
No. Replacement or cleaning criteria should consider element differential pressure, required flow and the approved maintenance procedure. A housing operating-pressure limit does not define the pressure loss that the cooling loop can tolerate.
Send the loop location, coolant details, flow and temperature range, pressure requirements, protected-equipment requirements and installation drawing. Include the element specification if already selected, plus the documents required for acceptance.
For a project inquiry, use LOONGFiltration's liquid-cooling filtration page and submit the duty and drawing for review through the LOONGFiltration website. The official LOONGFiltration YouTube channel provides additional product viewing material; use approved configuration documents for engineering acceptance.