Views: 51 Author: Site Editor Publish Time: 2026-11-13 Origin: Site
CDU filter selection starts with the cooling equipment's particle-control requirement and the flow the loop must deliver. The selected element then needs enough filtration area to meet that duty within the available pressure-drop budget, using materials compatible with the actual coolant. A micron label alone cannot establish those conditions.
An OEM purchase specification should identify the housing, element and seal set, with performance information for the intended operating conditions. Use the LOONGFiltration liquid-cooling application page to review the application context and the selection checks below to prepare a filter RFQ.
Start with the protected component's written cleanliness and filtration requirements.
Specify retention efficiency and its test basis alongside the micron rating.
Evaluate clean and loaded filter pressure drop at the actual coolant conditions.
Confirm compatibility across the complete wetted assembly and define how the filter will be serviced.
Mark the proposed filter location on the loop schematic before comparing products. In a liquid-to-liquid CDU installation, facility-side water and the IT-side coolant can have different chemistry, pressure limits and cleanliness requirements. State which circuit the filter serves and identify the downstream equipment it must protect.
Cooling architecture also varies between platforms. NVIDIA's DGX GB rack hardware guide describes coolant flowing through rack manifolds and CPU/GPU cold plates. Google's Brazos system uses a closed liquid loop with liquid-to-air heat rejection. Check the relevant platform documents for the coolant flow path and heat-rejection arrangement, then obtain its filtration requirements from the equipment supplier.
Distinguish commissioning cleanup from normal operation. Installation debris can require a temporary flushing arrangement, while an operating filter must control the contamination expected during service. Obtain the equipment supplier's flushing and acceptance procedure before connecting sensitive components.
Selection input | What the RFQ should state | Decision it supports |
|---|---|---|
Circuit and location | Facility side, secondary loop, fill line or separate treatment branch | Defines the protected flow path |
Protected equipment | Cold plates, valves, connectors and their supplier requirements | Establishes the particle-control target |
Hydraulic duty | Minimum, normal and maximum flow; available filter pressure drop | Determines required area and assembly size |
Coolant | Product name, formulation, concentration basis and temperature range | Supports hydraulic and material review |
Contamination | Commissioning debris, operating particle measurements or known sources | Guides media choice and maintenance planning |
Service conditions | Access space, isolation arrangement and continuity requirement | Determines a practical housing configuration |
Use the cold plate and other sensitive component specifications to set the required particle control. A component drawing can help explain the flow passages, but channel dimensions by themselves do not define a suitable retention rating or a safe contamination level.
The OCP Reservoir and Pumping Unit Specification, version 1.0, section 9.3 makes filtration requirements dependent on the connected cold plates, valves and other particle-sensitive components. Its guidance belongs to that RPU design context. A filter value from one reference design should not be copied into every CDU specification.
Ask suppliers to explain what their stated rating means. A nominal rating needs an associated removal efficiency and test method. An absolute rating also needs a defined efficiency or retention criterion, with the relevant test conditions. Two elements carrying the same micron number may therefore have different demonstrated performance.
For a mesh element, confirm whether the quoted value describes the opening size or a measured retention result. For depth or pleated media, request the efficiency data used to assign the grade. Keep the test fluid and method visible when comparing offers.
Size the filter against the pressure available after accounting for the rest of the circuit. The pump must still deliver the required flow through the protected equipment as the filter accumulates contamination. Reserve an operating margin between the clean condition and the agreed service trigger.
A useful pressure-drop curve identifies the element, housing and connection arrangement. It also states the fluid, temperature, flow range and pressure measurement locations. A bare-element curve excludes the losses introduced by the housing and connections; confirm the measurement boundary before entering a value into the system calculation.
Water test data may need correction or additional testing for a glycol-based coolant. Fluid viscosity changes with formulation and temperature, so a curve at one warm condition may not represent the most demanding startup condition. Request a justified conversion method or testing for the specified fluid and operating range.
Separate the housing's allowable working pressure from the element's differential-pressure limit. The first concerns pressure containment. The second concerns pressure across the element under specified conditions. Neither establishes the assembly's normal pressure drop at a stated flow. Agree on alarm and service thresholds with the CDU designer and element supplier.
Review the exact coolant product and all wetted materials. A description such as PG25 does not fully identify the inhibitor package, concentration basis or fluid condition. Record whether the stated concentration is by mass or volume and obtain the coolant supplier's technical documentation.
The compatibility review should cover the filter medium, support layers and core, end caps, bonding materials, housing, seals and wetted instrument parts. Temperature and exposure duration belong in that review. A compatible stainless steel housing cannot establish the suitability of an elastomer seal or bonded cartridge.
Ask whether the evidence is a general material chart, a supplier recommendation or a test on the actual assembly. Record unresolved combinations before ordering. Where qualification testing is needed, agree on exposure conditions and acceptance criteria with the system and coolant suppliers.
Particle filtration addresses suspended contamination. Dissolved ions, depleted inhibitors and other chemistry changes need separate evaluation. Ion-exchange or adsorptive media can alter coolant chemistry, so their use should follow an approved fluid-treatment plan.
Choose the element construction for the required retention, hydraulic duty and maintenance method. Metal mesh may suit duties with an approved cleaning process. Depth or pleated polymer media may suit other particle-control requirements. Compare the actual products and their evidence; material names alone cannot establish filtration performance or reuse suitability.
If cleaning is proposed, define how acceptable performance will be confirmed afterward. Restored flow alone does not establish retained particle-removal capability. A disposable element also needs a replacement procedure that prevents dirt from entering the clean side during handling.
Housing selection should include removal clearance, drain and vent provisions, differential-pressure measurement and access to seals. The LOONGFiltration CDU-2 Inline Filter page describes a quick-opening cover that provides cartridge access without disconnecting the inlet and outlet piping. Confirm the selected model's drawing and service procedure. Opening the cover still requires the approved isolation, depressurization and drainage steps.
Evidence to request | Scope to check | Acceptance question |
|---|---|---|
Retention data | Exact element grade and stated method | Does the demonstrated efficiency meet the component requirement? |
Flow/pressure-drop data | Specified fluid, temperature and assembly boundary | Can the loop deliver its required flow with maintenance margin? |
Pressure and temperature limits | Housing, seals and element separately | Are all parts suitable for the specified operating envelope? |
Wetted-material list | Every part in contact with coolant | Is compatibility supported for the actual formulation? |
Drawing and service instructions | Connections, orientation, access and element fit | Can the assembly be installed and maintained as planned? |
Cleaning or replacement criteria | Approved procedure and post-service checks | How will acceptable operation be confirmed before restart? |
Issue the housing and element identities together, including the selected seal material. Attach the loop inputs and list the evidence required before approval. This prevents a quotation for a suitable housing from being treated as confirmation of a particular retention rating or coolant-compatible assembly.
At commissioning, record the clean differential pressure with the associated flow and coolant temperature. Keep that baseline alongside subsequent readings and service records. Changes can then be assessed against comparable operating conditions and the approved maintenance limits.
For a configuration review, send LOONGFiltration the loop requirements, component specifications and available coolant documentation. Product information is available on the LOONGFiltration website, with visual product references on the official LOONG-filtration YouTube channel. Use model-specific documents to approve the final configuration.
Use the requirement issued for the protected cold plates, valves and other sensitive equipment. Then confirm the element's retention efficiency and test method. A micron number taken from another cooling system cannot establish suitability for your loop.
It can support an initial review if its conditions and measurement boundary are clear. Final selection needs an appropriate fluid-property correction or relevant testing for the actual coolant concentration and temperature range.
No. The element construction, seals and every other wetted part also require review. Compatibility evidence should identify the fluid formulation, operating temperature and exposure conditions it covers.
Follow the approved element and system service criteria. Evaluate differential pressure at a known flow and temperature, required equipment flow and relevant cleanliness results. Establish the trigger during system qualification instead of assigning an unsupported calendar interval.