OEM CDU filtration design should produce a configuration that can be reviewed, tested and reproduced. The starting point is the cooling-loop duty and the protected equipment's requirements. The design output should identify the housing, element and seals, define their interfaces and state the evidence needed for acceptance.
A verification plan connects those requirements to checks with defined conditions and owners. It should be prepared before prototype results arrive. Use the CDU and cold-plate filter selection guide to establish the selection inputs, then develop the configuration and verification records needed for the OEM's approval process.
Give every requirement an owner, an applicable configuration and an acceptance method.
Define mechanical, hydraulic, material and monitoring interfaces before prototype approval.
Use risk review to identify missing controls and evidence needs.
Tie test results to a revision-controlled assembly and review subsequent changes for their effect on acceptance.
Start with a circuit diagram that identifies where the filter sits and what it protects. State whether the duty concerns facility-side water, an IT-side secondary loop, a fill line or another defined location. Record the equipment requirements that govern particle control and flow delivery.
Use platform documents to identify the actual flow path. For example, NVIDIA's DGX GB rack hardware guide describes coolant distribution through rack manifolds to CPU and GPU cold plates. That establishes an architecture to examine; it does not issue a universal micron rating or qualify an OEM filter configuration.
List the flow range, available filter pressure budget, operating pressure and temperature envelope. Identify the commercial coolant and concentration basis. Include startup, maintenance and other required operating modes where their conditions differ. Keep unresolved inputs visible with an assigned owner and a decision date.
Requirement group | Information to define | Responsible interface |
|---|---|---|
Particle control | Protected-component requirement, retention target and evidence basis | Equipment owner, component supplier and element supplier |
Hydraulic duty | Required flow range, fluid conditions and allocated pressure loss | CDU designer and filter supplier |
Pressure boundary | Operating envelope, connections and applicable mechanical requirements | OEM mechanical lead and housing supplier |
Wetted materials | Coolant formulation, complete material list and compatibility basis | Coolant supplier, OEM and component suppliers |
Service | Isolation approach, access envelope, element handling and restart checks | OEM service lead and site operator |
Monitoring | Measurement locations, alarms and control-system responsibilities | OEM controls lead and system integrator |
Create a bill of materials for the complete filtration assembly. Identify the housing version, element construction and grade, sealing arrangement and wetted accessories. Attach the current drawing and list the documents that establish each part's limits.
Specify connections by their actual standard, dimensions and sealing method. Show flow direction, mounting orientation and removal clearance. Include the external pipe loads or support requirements that the OEM needs the housing supplier to address. State who supplies adapters, isolation valves and measurement fittings.
The LOONGFiltration CDU-2 inline filter page identifies a product intended for secondary-loop filtration. An OEM inquiry should still define the required version and installed element. Cartridge rating, pressure loss and compatibility belong to the identified configuration and its supporting documents.
Record the boundary between component approval and system integration. A supplier's housing pressure test cannot establish the assembled CDU's flow delivery, control response or protected-component cleanliness. Assign those system checks to the relevant owner.
Review how the assembly or service process might fail to meet its function. Relevant questions may include an incorrectly seated element, excessive loading, leakage, an unsuitable replacement seal or contamination introduced during maintenance. Assess causes, effects and existing controls for the modes that apply to the design.
IEC 60812:2018 provides a general framework for planning, performing and maintaining failure modes and effects analysis. Applying a risk-review method does not certify the filter or prescribe CDU-specific acceptance values. Tailor the review to the OEM's process and available evidence.
Connect each action to a design requirement or verification task. A sensor can support detection only if its location, range and system response suit the failure under review. An instruction can support a service control only if the actual installation permits the operator to follow it.
Avoid assigning unsupported numerical failure probabilities to fill a worksheet. Where evidence is incomplete, record the uncertainty and the planned action. Revisit the review after prototype testing and after changes that affect the flow path or service procedure.
For each requirement, define the test or document review, its conditions, the acceptance criterion and the person responsible for disposition. Identify the sample configuration and preparation state. Keep raw measurements linked to the report and configuration revision.
The OCP liquid-to-liquid CDU test methodology, Revision 1.0 distinguishes component-level and system-level testing. That distinction helps organize evidence: a filter test answers its defined question, while the integrated CDU still needs the applicable system checks.
Choose criteria from the actual equipment requirements and applicable engineering documents. Confirm the method and acceptance basis with the relevant suppliers before testing. A favorable result under a different fluid or measurement boundary needs an applicability assessment before it can close the requirement.
Verification area | Configuration and conditions to identify | Evidence for review |
|---|---|---|
Retention | Element grade, construction, challenge and test method | Efficiency or retention result against the agreed requirement |
Hydraulic performance | Assembly boundary, flow range, coolant and temperature | Measured or justified pressure-loss data and system-budget review |
Mechanical integrity | Housing, closure, seals, connections and approved procedure | Applicable pressure/leak records and post-test inspection |
Compatibility | All wetted materials, fluid formulation and exposure | Material assessment or relevant testing within its stated scope |
Serviceability | Installation envelope, isolation arrangement and task sequence | Demonstration records, access checks and updated instructions |
Controls and integration | Measurement points, signal handling and defined operating modes | Sensor, alarm and system-response checks |
Confirm that the built sample matches the approved bill of materials before interpreting results. Record deviations, temporary fittings and any changes made during testing. A test report needs enough configuration detail to show what passed and what remains untested.
Review serviceability with the surrounding piping and equipment represented. Check whether the element can be removed, the seals inspected and the clean side protected using the proposed procedure. A cover that opens on a bench may need additional clearance in the installed CDU.
Assess performance across the required operating modes. Review clean filter loss alongside the planned maintenance trigger and the minimum flow the system must maintain. If a test fails, retain the result, record the corrective change and identify which checks need repetition.
Prototype completion should end with a disposition for each requirement: accepted against identified evidence, accepted with a defined limitation or unresolved with an assigned action. Avoid treating an incomplete verification matrix as an approved product configuration.
Release the accepted drawing, bill of materials and inspection requirements together. Identify which checks apply to the design qualification and which apply to routine production acceptance. State the documentation and traceability expected with delivered assemblies and replacement elements.
Define a change-notification process for materials, suppliers, construction, dimensions and preparation procedures. The OEM should assess whether existing evidence still covers the change. A same-size replacement element may require renewed retention, hydraulic, compatibility or service review.
Keep the accepted service instructions with the configuration record. Establish how field observations and nonconformities reach the responsible engineering team. Where an operating issue changes an assumption in the risk review, update the requirement or verification plan through the same controlled process.
For an OEM review, submit the duty, circuit diagram and required acceptance evidence through the LOONGFiltration liquid-cooling page or the company website. The official LOONG-filtration YouTube channel provides product viewing references; the approved configuration and reports should govern engineering acceptance.
The supplier can support the filtration scope it has agreed to assess. The OEM must assign ownership for integration and obtain the evidence required for the complete system. Make those responsibilities explicit in the project documents.
It identifies material within the certificate's scope. Compatibility review also needs the actual fluid, exposure conditions and every wetted part. Some combinations may require testing under an agreed method before acceptance.
Agree on them before the corresponding test begins. Tie the criteria to the equipment requirements and method, including configuration and operating conditions. Resolve differences before using results to approve the design.
Only within the accepted scope and change rules. Review substitutions against the requirements affected and identify any further evidence needed. Keep the approved replacement identity accessible to procurement and service teams.